Showing posts with label millwork. Show all posts
Showing posts with label millwork. Show all posts

Tuesday, September 6, 2011

Glencroft - Day 4 through 6

I've been working sporadically on Glencroft while I was sick this last week, mostly because everything I need to finish off the Chantilly is still in a box, somewhere, probably wrapped in paper and dust.

I have the second floor installed and glued.  I put white cardstock up in the living room rather than try to plaster, and I was very sure I didn't want stucco on all the walls.  I then undertook the paperclay fireplace.

First off, Paperclay is vastly superior to the DAS modelling clay I used in the Chantilly.  It has virtually no odour, isn't sticky, and takes longer to dry so it is far easier to work with.  Also it goes through the pasta machine much slicker which is again because it isn't sticky.

I rolled out numerous strips of paper clay and glued them to the bare plywood, then with a moist paper towel I smoothed the pieces together and built up some texture.  Next the stones were shaped by pressing the lines in and pulling the clay towards the centre of the stone to add depth.

After the clay dried I added black watercolours to the cracks in the stone and blocked in stone colours with the left over paint on my watercolour palette.  A few dirty washes of grey with a bit of yellow or red and the tones were evened out quite nicely.

The wiring was a touch trickier than I thought, i dug out a channel for the right wall sconce with my dremel and built the clay up over top.  the left sconce and the candles on the second floor have individual holes for the wires to run through, at this point I know the power strip is either going in the chimney or in the foundation,either way the wires are traveling through the chimney to get to their destination.

When I built the baseboard in the living room I left them high enough to accomodate hardwood flooring, they will also accommodate the roundwire should I decide to add table or floor lamps.  The dining room / kitchen will have ceiling fixtures.The hardest part of the wiring so far has been the planning by a long shot.  It's hard to know where you will want lighting when all you have built is a portion of a large box!

Saturday, September 3, 2011

Glencroft - Day 1 through 3

Well my move is finally almost complete - almost because I still haven't finished unpacking everything.  It certainly will be nice to be able to use the garage once this endeavour has been completed.  One of the boxes that did get unpacked however is my Glencroft.  I really have enjoyed working on the Chantilly for mom, so I have decided to build another slightly larger (ie. full scale) house, with full electrification, to sit in the hallway of the new house.  I've had my eye on the Glencroft for years so this is actually quite an exciting undertaking.

The first difference is of course the scale, this house is freaking huge!  The second massive difference is I'm now working with a die-cut kit rather than a laser cut.  The difference in detail is definitely noticeable, but then it will be easier to add detail to this scale as well - it all comes out in the wash.

The third difference I've noticed is the cost to work on a larger scale house.  I got wood for the 1st story flooring today and it cost about as much as all the flooring for the Chantilly, and possibly the siding as well.  The entire Chantilly will easily fit in the living room of Glencroft.

That said, I have a stack of HOM furniture kits kicking around, so it will be cheaper to furnish :)

I completed a few dry fits and I think I have narrowed down the problem areas in this house - they are the ceiling beams, the stair well, and the yard if I choose to install it.  Today I papered the stairwell and started staining the lower portions of the living room walls and exposed framework with Minwax Jacobean.  Any of the wood with the "good side" exposed seems to take another coat of two of stain to match the stain put on the "bad side", but at least I'm getting it to match.

I also think I will forego the kit mantle for the first floor fireplace and fashion a more elaborate fireplace to compliment the siding, and then plaster or paper the upper portions of the walls to keep the room from becoming too dark and depressing.  I also need to mark out the lighting and find a place to hide this electrical panel.






 

Sunday, August 14, 2011

Chantilly - Day 22

I'm on the home stretch now!  I finished off two rooms tonight by tackling the ceilings.  I hadn't thought of them at all during the build and then about 2 weeks ago as I was examining it from the sofa I realized that I could see the tabs on the second floor ceilings!

I covered the ceilings in watercolour paper and added beams to the living room and upstairs room.  I'm still on a hunt for a medallion for the dining room as I'm not in love with the one I made .  I may go with a patterned paper... or i'll just continue with my beams throughout - who knows!  I may wake up tomorrow and hate it.

Tuesday, August 2, 2011

Chantilly - Day 20

The day 20 post had to wait until the glue dried and the tape could come off!  I finally got the posts and trim painted and installed, along with the door!This house is almost ready to go in to a box for moving!!

I had to trim the side pieces to accommodate the siding (next house will have a complete dry fit with pencil markings).  The door was enameled and has 1/2 scale doorknobs glued on.